https://streamrestoration.typepad.com > Post Project Maintenance

Bend 2 After Record Floods
Bend 1 After Record Floods
Melissa Operating the CAT 303C Mini-Excavator
Toe-Wood Structure Installed on Bend 2
Joy Operating the CAT 324D Excavator
Back Fill Atop Toe-Wood Structure on Bend 2
Watering Transplants on Bend 2 Toe-Wood Structure
Bend 1 - Outside bank after post-flood maintenance