https://streamrestoration.typepad.com > Phase II: Final Bend

looking downstream towards the last bend
looking downstream to eroding outer bank
Final section, shows bank that lost 7+ feet of erosion in one year
looking downstream from start of bend III, right bank.
Existing channel, will be plugged
looking upstream where an un-named tributary joins the river
Looking upstream to the connection of the relic channel (left) and active channel (right)
looking upstream at the connection of the relic channel (left) and active channel (right)
Photo point shows where tributary will meet with the Middle Fork post restoration
Looking upstream at future location of JHook #4
Looking at berm constructed to divert flow away from construction area
looking downstream to the relic channel
Looking upstream at the location of JHook #5, the last of 6 structures
Material removed to develop connection to relic channel
Construction of J-Hook #4
J-Hook #4
Looking downstream from Fourth J-Hook
The "Hook"
Muddy Mess!
Completing fourth J-Hook
Looking downstream from the "Arm" of final J-Hook (#5)
Construction of the final J-Hook
Completing the final J-Hook
Completing the final J-Hook (#5)
Looking downstream at J-Hook 4, fill is being placed in the old active channel
Looking upstream at the right bank of J-Hook 4
Looking downstream at J-Hook 4
Looking downstream at the unsloped right bank of J-Hook 5
Looking upstream from the right bank terrace
Looking downstream at J-Hook 5
Looking across to the right bank of J-Hook 4
Looking at the sill of J-Hook 4
1124091242a
Tim moving a tree to plug the old active channel
Sloped point bar of Bend III
Looking downstream from above J-Hook 4
Sloping the bank of J-Hook 4
TNC employees livestaking above J-Hook 4
Looking across from the right bank to the now plugged and filled old active channel
Looking downstream to J-Hook 5
Riffle of J-Hook 4
Hendrix volunteers from their Environmental Concerns Committee
More Hendrix volunteers and Margaret Bartelt
Hendrix volunteers laying jute mat all the way up to the terrace of J-Hook 5
Hendrix volunteer
Hendrix volunteer
the sloped left bank of the terrace
Looking down to the connection from the right bank
Looking across from the old active channel left bank. Now filled.
Looking upstream to J-Hook 4 riffle
»