After a couple of floods of record (December 2010 and May 2011) swept through the restoration site, we performed a few "fixes" to Bend 1 and Bend 2. We installed a new structure called "toe-wood" on the eroding bank on Bend 2 to hold the bank in place while vegetation reestablishes. (See Photo Album titled Post Project Maintenance)
Comments